Our Clients
![Emergency Air Purification](http://circul-aire.com/wp-content/uploads/2015/07/ecomm3.png)
ECOMM CENTER
Emergency Air Purification
LOCATION:
Vancouver, British Columbia
OBJECTIVE:
Purify Contaminated Outdoor Air
EQUIPMENT:
USAH-406 Filtration Bank
KEY CONTAMINANTS:
CL2, NH3
MEDIA:
MM-9000, MM-7000. A custom blend of impregnated activated carbon.
![Total Air Treatment](http://circul-aire.com/wp-content/uploads/2015/07/jfkLib2.jpg)
JFK LIBRARY & MUSEUM
Total Air Treatment
LOCATION:
Boston, Massachusetts
OBJECTIVE:
Air Conditioning & Preservation of the Presidential Collection
PACKAGED UNITS:
Filtration
Heating & Cooling
Dehumidification
Small footprint to fit into existing challenging non-linear spaces.
![Total Air Treatment USA](http://circul-aire.com/wp-content/uploads/2015/07/strozier.jpg)
STROZIER LIBRARY ARCHIVES
Total Air Treatment
LOCATION:
Tallahassee, Florida
OBJECTIVE:
Preservation of the 8,000-ft2area’s collections
SINGLE PACKAGE UNIT:
Filtration
Heating & Cooling
Dehumidification
![Emergency Air Purification Canada](http://circul-aire.com/wp-content/uploads/2015/07/royalOntario.jpg)
ROYAL ONTARIO MUSEUM
Emergency Air Purification
LOCATION:
Toronto, Ontario
OBJECTIVE:
Preservation of Artifacts
FEATURES:
Outdoor air filtration to remove harmful pollutants
Disposable media trays
High airflow in compact space
![ICU HVAC SYSTEMS](http://circul-aire.com/wp-content/uploads/2015/07/washoe.png)
WASHOE MEDICAL CENTER
Retrofit to ICU HVAC System
LOCATION:
Reno, Nevada
OBJECTIVE:
Filtration of Outside Air Laden with Vehicle Exhaust
FEATURES:
Acid Gas Removal, Particulate Filtration
Maintains pristine environment throughoutintensive care unit
![Energy Recovery and Air Purification](http://circul-aire.com/wp-content/uploads/2015/07/renoTahoe2.jpg)
RENO/TAHOE AIRPORT
Energy Recovery and Air Purification
LOCATION:
Tallahassee, Florida
OBJECTIVE:
Filtration of Outside Air, Energy Recovery and Temperature Control
FEATURES:
Gas-Phase Filtration, Energy Recovery, Heating & Cooling
![Odor Control](http://circul-aire.com/wp-content/uploads/2015/07/forensicLab.png)
FORENSIC PATHOLOGY LAB
Odor Control of Autopsy Rooms
LOCATION:
Toronto, Ontario
OBJECTIVE:
Indoor Air Quality Without Additional Energy
FEATURES:
Remove gaseous pollutants, such as formaldehyde
Quiet Operation
![HVAC System](http://circul-aire.com/wp-content/uploads/2015/07/uniOfOtta.png)
UNIVERSITY OF OTTAWA
Retrofit to ICU HVAC System
LOCATION:
Ottawa, Ontario
OBJECTIVE:
Removal of Formaldehyde Without Added Energy Consumption
FEATURES:
Multi-stage Filtration
Quiet Operation
![Deep Bed Scrubber System](http://circul-aire.com/wp-content/uploads/2015/07/units.png)
WARDS ISLAND WWTP
Deep Bed Scrubber Systems
LOCATION:
New York, New York
OBJECTIVE:
Meet EPA Emission Criteria
EQUIPMENT:
High Density Scrubbers (HDS)
KEY CONTAMINANTS:
VOC, Mercaptans, H2S
67,000 CFM process air filteredto meet EPA emissions criteria
Circul-Aire ISO-certified laboratory used for emissions testing
![DBS](http://circul-aire.com/wp-content/uploads/2015/07/machine.png)
BEDOUKIAN RESEARCH
Deep Bed Scrubber Systems
LOCATION:
Danbury, Connecticut
OBJECTIVE:
Meet EPA Emission Criteria on Perfume Effluent
EQUIPMENT:
High Density Scrubbers (HDS)
KEY CONTAMINANTS:
Removal of VOC
30,000 CFM process air filtered to meet EPA emissions criteria
Circul-AireISO-certified laboratory used for emissions testing
![Process Control Room Air Purification](http://circul-aire.com/wp-content/uploads/2015/07/pulpNpapesMill.png)
RIAU ANDALAN PULP&PAPER
Process Control Room Air Purification
LOCATION:
Kerinci, North Sumatra (Indonesia)
OBJECTIVE:
Pressurization, Recirculation & Air Conditioning
FEATURES:
Acid Gas Removal,Particulate Filtration
Pristine Environment maintained in 73 Electrical Rooms, 29 Rack Rooms, and 23 Control Rooms
![Electrical Room Air Purification](http://circul-aire.com/wp-content/uploads/2015/07/petrochemical.png)
CHINESE PETROCHEMICAL
Process Control Room & Electrical Room Air Purification
LOCATION:
Kaohsiung (Taiwan)
OBJECTIVE:
Pressurization, Recirculation & Air Conditioning
FEATURES:
Acid Gas Removal, Particulate Filtration, Temperature & Humidity Control
Maintained pristine environment throughoutthe entire plant
![Emergency Response Center Air Purification](http://circul-aire.com/wp-content/uploads/2015/07/CAgovt.png)
GOVERNMENT OF CANADA
Y2K Emergency Response Center
LOCATION:
Public Works department, Ottawa, Canada
OBJECTIVE:
Outdoor Air Filtration, A/C
FEATURES:
Outdoor air filtration to remove harmful pollutants such as NOx, SOx, O3,CO, HC
MM-1355 (UL Class I) media, Surveyor+ electronic air quality monitoring system, Tech-Chekmedia service.
![BC Hyrdro](http://circul-aire.com/wp-content/uploads/2015/07/bcHydro.png)
Most of the electrical requirements for Vancouver Island, B.C. are supplied from the mainland via submarine cables installed and operated by British Columbia Hydro. Between 1967 and 1979, a bi-polar high voltage direct- current (HVDC) link was installed to meet the ever growing demand for electrical power.
![Bombardier](http://circul-aire.com/wp-content/uploads/2015/07/canadairLogo.png)
Located at Montreal International Airport (Dorval), the building consolidates Canadair aerospace activities previously scattered in six older facilities, reuniting all corporate, program and administrative personnel. This state of the art office building was set up by our team.
![George Bush Museum](http://circul-aire.com/wp-content/uploads/2015/07/bush.png)
Environmental forces play an important role in establishing the preservation characteristics of artifacts in a conservatory. Environmental control strategy within a museum will result in severe damage or degradation of the materials on display or in long/short term storage.
![Harrahs](http://circul-aire.com/wp-content/uploads/2015/07/harrahs.png)
Major cities across the U.S. have banned cigarette smoking from bars and restaurants, however smokers and nonsmokers can coexist, and a properly designed filtration system can mitigate gas and particulate emissions, while still meeting the intent of the local codes and regulations.
![Kansas City Zoo](http://circul-aire.com/wp-content/uploads/2015/07/kansas.png)
This 75,000 sq. ft. pavilion is actually two inter-connected buildings. The first building is the entryway for the visitors of the zoo, illuminated by a large skylight and adorned with tropical plants. The sloping ceilings and curved walls of this building add to provide a natural atmosphere.
![Miami-Dade County Shoolboard](http://circul-aire.com/wp-content/uploads/2015/07/dade2.png)
Demographic changes in the Miami, Florida area forced the Dade County School Board to construct new primary learning centers in order to accommodate the influx of new students.